
GENERAL TIPS FOR INSTALLATION
Step 1: Prepare the Surface
- Clean the wall to remove dust, old coatings, or irregularities.
- If the wall is uneven, level it with plaster or drywall.
- In humid areas, treat the wall with an antiseptic solution.
- If installing a floating wall, attach a temporary support plank to level the bottom of the wall.
Step 2: Installation
- Measure and mark the position of panels and other wall parts.
- Attach the provided shims to the wall using #16 or #18 finishing nails, following the installation diagram.
Ensure that your nail gun is adjusted so that the nails are driven flush with the surface of the shims, providing a smooth and secure base. - Apply construction adhesive to the shims and press the panel against the shims. Shake a little for even distribution of adhesive behind.
- Press the panel firmly against the wall and level it on the supporting plank or the baseboard.
- Align additional panels tightly and repeat the process.
Step 3: Finishing Touches
- Install shelves on the backing wall through wall panels (please note – the panels themselves are not structural).
- Inspect the installation to ensure all panels are secure.
The recommended adhesive “Fuze It Max” (Home Depot Product # 313740337). You may purchase it online or in Home Depot stores.
